Project: Slideways z26
-
- Registered User
- Posts: 452
- Joined: Thu Oct 28, 2010 10:27 pm
- Location: GRAND RAPIDS MI
Re: Project: Slideways z26
1/8th inch thick where? that Atmost, where i can see in the pic is 16 gauge. Look at the end of where he notched it.
- 3X00-Modified
- Administrator
- Posts: 10915
- Joined: Thu Jul 05, 2007 9:18 am
- Location: Brooklyn CT
Re: Project: Slideways z26
16 gauge is less than a 1/16" do you have any idea what a 1/16" looks like? because whats in that pic is way more than 1/16" thick... But I'll leave that to Barry to verify.
Re: Project: Slideways z26
I think it's 12 gauge. Still less than a 1/8". Keep in mind this will not be supporting much vertical load once these tower are done. It is only responsible for front and back and side to side of the subframe. Once the shock towers are boxed to the stock towers the angles members you see will only be extra reinforcement.
Let my girl worry about my member thickness haha
Let my girl worry about my member thickness haha
Re: Project: Slideways z26
Yes please. Mostly pics of the back.Barry wrote:I have 92 mounts. There is only a front and back mount. U want pics of that?
95' BRM Z26. cammed/ported 3400/3500 Hybrid. HM282, OBD2, Garret T3/T04E 60 Trim, IC.heavywoody wrote:Beretta, fast, reliable, and cost effective are words that should not be used in the same sentence.
Re: Project: Slideways z26
Any updates?
Project: Slideways z26


Pads to get more surface area

Towers almost done, just need a tiny more fab and some paint.
This means the rear end is nearly complete. I ordered a walboro inline 255lph pump, and have a fuel cell picked out just need to buy it. After fuel cell the rear is done and I'm gonna get started on the front end.
Re: Project: Slideways z26
you just turning your 3500 sideways or are you starting with a fresh one?? i'll take the trans mount off your hands if you arent doing anything with it. 

1991 beretta GTZ- 2.3l w41 cams, ported 086 head with a 3 angle valve job, fidanza flywheel with exedy racing clutch, 3.94fdr from and scx, so much more..
Re: Project: Slideways z26
Re using my old motor. It has under 30k on it and has comp valve springs. Trans and mount is spoken for I think
-
- Registered User
- Posts: 452
- Joined: Thu Oct 28, 2010 10:27 pm
- Location: GRAND RAPIDS MI
Re: Project: Slideways z26
Whats with the home depot menards steel selection?? Do you not have any steel yards around you?
Re: Project: Slideways z26
I have been using stuff I had laying around for free. Steel box is something I would pick up at a steel yard but I only can get there one day a week and have been too busy. This stuff is already over strong for what it is
-
- Registered User
- Posts: 535
- Joined: Fri Oct 29, 2010 8:52 am
Re: Project: Slideways z26
Looks like it's moving right along.Are the shift cables still spoken for?
Meaning are you selling them to meeee?
Meaning are you selling them to meeee?
Re: Project: Slideways z26
Gotta love using free stuff for projects. Makes life a lot easier. And if it breaks, who cares since it was free. With the pics I'd just like to see how it mounts to the trans and to the body if that's possible.
Am I still in line for your exhaust or has someone else gotten it?
Am I still in line for your exhaust or has someone else gotten it?
95' BRM Z26. cammed/ported 3400/3500 Hybrid. HM282, OBD2, Garret T3/T04E 60 Trim, IC.heavywoody wrote:Beretta, fast, reliable, and cost effective are words that should not be used in the same sentence.
Re: Project: Slideways z26
Z26_T wrote:Gotta love using free stuff for projects. Makes life a lot easier. And if it breaks, who cares since it was free. With the pics I'd just like to see how it mounts to the trans and to the body if that's possible.
Am I still in line for your exhaust or has someone else gotten it?
Thats just wrong man, if it breaks, I'm sure he would care, the car might be a total loss. I'd hate to invest all that time to just have the car trashed because of free material. Looking good so far, hope to see it get sideways soon. I will be right behind you.
Re: Project: Slideways z26
It will not break. These towers are so serious. But yeah these parts need to be able to handle serious beating. I get air a lot on the track.
All parts are still avail.
All parts are still avail.
Re: Project: Slideways z26
Meant that if "something breaks" could mean the differance of you driving the car off or getting it towed off. No one here wants it to break, but you would care if it did, just because the material was "free" doesn't make it ok.